![]() |
||
|
MULTIMEDIA LIBRARY |
GEOPHYSICAL HYDRAULICS |
|
|
FLUVIAL HYDRAULICS
|
||
|
The stepped channel was constructed in Meiji Period (more 100 years before). Artificial stepped channel was designed on the basis of a drop structure in France. In the case of stepped chute due to stones, even if concrete was not used as a segment, the structure has been remained. |
|
|
|
By Youichi Yasuda |