IAHR MEDIA LIBRARY

MULTIMEDIA LIBRARY

APPLIED HYDRAULICS


HYDRAULIC STRUCTURES

Sabo works in the Hiakari-gawa catchment (3)

Sabo works in the Hiakari-gawa catchment, Toyota, Aichi prefecture. Combination of an upstream tubular grid check dam (H = 9 m, L = 55 m, 2 elements) with a downstream concrete check dam (H = 7 m, L = 52 m): details of the tubular structure. Photograph taken on 10 Nov. 2001.


© Hubert Chanson, Dept. of Civil Engineering, University of Queensland, Australia