MULTIMEDIA LIBRARY -
APPLIED HYDRAULICS
HYDRAULIC STRUCTURES
Ancient sabo works near
Matsumoto
AD 1916 - Ancient sabo
works near Matsumoto, Nagano Prefecture (1895-1920). Artificial stepped
channel designed by a Japanese engineer, modeled on Durance catchment
works (construction: 1916-18). Photograph taken in Nov. 1998.
©
Hubert Chanson, Dept. of Civil Engineering,
University of Queensland, Australia |